Project: xinjiang luobubo potash co., LTD. Annual output of 1.2 million tons of potash fertilizer Project

Salt lake is located in the Project the introduction: the lop nur were systematically stud Ed in general the Mongolian autonomous prefecture of xinjiang uygur autonomous region, the administrative area belongs to the town of jurisdiction, ruoqiang lop nur were systematically stud Ed from the northeast with 383 km, west to korla, 542 km, east of dunhuang city, 470 km, processing plant engineering town 1.5 km northeast from the planning of the lop nur were systematically stud Ed, ha Luo Re road north side.

The company provides products: slurry pump and its auxiliary equipment.

Project time: July 2015.