CASES
China petroleum chongqing sales branch, fu niu xi reservoir expansion renovation project
Project description:
In 2010, petrochina chongqing marketing branch expansion renovation FuNiu creek terminal, the terminal side expansion by the original 90000 to 300000, enlarged, the terminal become the largest commercial reserve depot in the upper Yangtze river, putting-in-service
proactively fire pump equipment in this project, my company is the escort safety of oil depots.
Owner: China petroleum and natural gas co., LTD. Chongqing sales branch
Purchasing unit: China petroleum and natural gas co., LTD. Chongqing sales branch
Contract amount: 1.13 million yuan
Supplied equipment:
1. Electric fire pump and starter cabinet: xbd10/300 (hs300-250-650b, 10KV, 450KW)
2. Diesel engine fire pump and automatic control cabinet: xbd10/300 (hs300-250-650b, dongfeng cummins kta19-p750)
3. Electric fire foam pump and starting cabinet: xbd13/200 (hs250-200-650b, 10KV, 400KW)
4. Diesel engine fire foam pump and automatic control cabinet: xbd13/200 (hs250-200-650b, dongfeng cummins kta19-p680)
Service condition:
This batch of fire pump installation putting-in-service proactively since late 2010, the parameter indexes meet the requirements, and perform well in oil depot fire drill in the well to complete the task for many times, the escort for the safe and stable operation of oil depots. Contact person: fu niu xi, Mr. Ran: 023-6 * * * 1967
- LAST:
- NEXT:Shenyang chemical project