CASES
Wet smelting copper smelting project
Total package: NORINCO International Cooperation Ltd.
Owner: wanbao mining co. LTD
Project:Myanmar copper mine yangzi mining co., LTD
Mining engineering
Physical properties of conveying materials: copper sulfate solution: weight 1.05 ~ 1.2; H2SO4:1 ~ 45g/l; Cu2 + : 0 ~ 10g/l; Cl - < 5 PPM. & NBSP; Temperature: 25 ~ 65 ℃
Main equipment: the stainless steel chemical pump (ASP5030 series) a total of 24 sets
1.1 Equipment list
Number |
Name |
Equipment number |
Models |
Material of flow parts |
1 |
The liquid transfer pump |
GE0610ME01-02 |
ASP5030-200-315A |
CD4MCu |
2 |
Electric product front liquid circulating pump |
GE0610ME03-05 |
ASP5030-300-400B |
CD4MCu |
3 |
The electric product pit pump |
GE0610ME08 |
80FY-32 |
CD4MCu |
4 |
Electric poor delivery pump |
GE0510ME01-02 |
ASP5030-200-315A |
CD4MCu |
5 |
Load organic phase delivery pump |
GE0510ME03-04 |
ASP5030-300-550C |
CD4MCu |
6 |
Flocculation pump |
GE0510ME07 |
ASP5030-40-250A |
CD4MCu |
7 |
Three phase separation after water phase pump |
GE0510ME08-09 |
ASP5030-25-200B |
CD4MCu |
8 |
The clay treatment of the liquid pump |
GE0510ME10 |
ASP5030-40-160C |
CD4MCu |
9 |
Three phase separation of the organic pump |
GE0810ME11 |
ASP5030-25-200B |
CD4MCu |
10 |
Extract the pit pump |
GE0510ME12 |
65FY-32A |
CD4MCu |
11 |
Oil float pump |
GE0510ME13-14 |
ASP5030-40-160C |
CD4MCu |
12 |
Extract liquid transfer pump |
GE0510ME15-16 |
ASP5030-300-550 |
CD4MCu |
13 |
Sulphuric acid supplement metering screw pump |
PS0620MP01 |
NM045BY03S18V |
CD4MCu |
14 |
Sulphuric acid supplement metering screw pump |
PS0620MP02 |
NM045BY03S18V |
CD4MCu |
15 |
Acid pit pump |
PS0620MP03 |
65FY-20 |
CD4MCu |
16 |
Sulfate discharge pump |
PS0620MP04 |
ASP5030-50-250 |
CD4MCu |
1.1 Equipment conditions
1.2.1 Mine survey and geographical conditions
The S&K copper project is located in the southern part of Sagaing, myanmar, with a direct distance of 5Km from Monywa, the largest town in the province, and about 26Km from the highway. The geographical coordinates of the mining area are: 22n, 07 'n, 95 n. The mine area is about 32.73 km2. Starting from the mine, the town of mengyuwa can reach the central economic center of Mandalay, which is 110Km to the east, and 722Km south to yangon. The mining area is connected with the highway water in the town of monywa, and the railway (rice track) and the small airport are connected with the small airport and the transportation is convenient.
(figure 1) location map of mining area
- LAST:Gold smelter in the gold group
- NEXT:Zijin mining