Jingdian pump station lanzhou office

Date:2017-06-16  Views:947

I. project introduction:

Electrical engineering is inter-provincial cascade, big flow, high lift, much of big Ⅱ type water pumping irrigation works. The design flow is 28.6 cubic meters per second, with an increase of 33 cubic meters per second, and the construction of 43 pumping stations with a capacity of 270,000 kilowatts; There are 1,391 dry, branch and ditches, 2,422 km long, irrigated area of 1 million mu, total investment of 856 million yuan, overall planning and stage construction.

Phase I: construction started in October 1969, and water in October 1971. The design flow is 10.6 m3 / s, and the flow rate is 12 cubic meters per second, with a yearly volume of 148 million cubic meters. The station has 13 stations, with a capacity of 67,000 kilowatts and a total head of 472 meters. The state invested 60.08 million yuan. Design irrigation area of 30.42 million mu.

Phase ii: construction started in July 1984 and water in October 1987. The design flow is 18 cubic meters per second, and the flow rate is 21 cubic meters per second, and the annual water volume is 266 million cubic meters. The station has 30 stations, with a capacity of 19.27 million kilowatts and a total head of 713 meters. The state invested 488 million yuan. Design irrigation area of 52.05 million mu.

The second phase extends to the water diversion project: construction began in 1995, completed in 2000, and began to adjust water to the people in March 2001. It is an emergency project which USES the water gap and idle flow of the second phase project to adjust water to the people and relieve the exhaustion of the water resources and the deterioration of the ecological environment. The engineering design flow is 6 cubic meters per second, and the annual water volume is 61 million cubic meters. The estimated cost of the project was 309 million yuan. Restoration of irrigation area of 152,000 mu.

It is regarded as "the most" in China, with comprehensive evaluation of its head, flow, capacity and irrigation area.


二、主要产品参数:

1、HS1200-1000-1150A ,流量3.55m3/h,扬程57米,电机功率2500kw。

2、HS1200-1000-1100A ,流量3.55m3/h,扬程34米,电机功率1600kw。