CASES
Beijing new office
Zarand Iranian steel company(ZISCO Phase II) Project Equipment Supply Subcontract
Construction scale:Annual treatment of 2 million tons of iron ore。
Construction background:The project was built at high altitude and was originally designed by Germany's design institute, which was forced out of the project because of western sanctions. The project was completed by China Nonferrous Metal Industry's Foreign Engineering and Construction Co., Ltd. And Iran FST, which was designed and constructed by the Iranian side.
Device description:Due to the original design is a design company in Germany, the project execution high technical requirements, our company are designed with Iran after many coordination, communication, digesting and absorbing the project execution technology standard and in accordance with the standards organization of production water pump equipment. The pumps involved in this project are a batch of large caliber end suction pumps, of which the model is500-500-560 is the first in our company and also in the lead at home.
Client investigation return visit: