CASES
The first phase 49.5 MW engineering fire equipment of the xinjiang burjin wind farm
Date:2017-05-05 Views:1091
Project | The first phase 49.5 MW engineering fire equipment of the xinjiang burjin wind farm |
Project Address | Altay, xinjiang |
Company | China water conservancy and hydropower engineering bureau co. LTD. |
Major Products | Fire pump, stabilizer pump, control cabinet |