60 years focused on metallurgy / mine / water industry pump system

E-mail|Contact US|Chinese|English|Russian

TEL:86-21-59167911
Email:frank@sanlianpump.com

The first phase 49.5 MW engineering fire equipment of the xinjiang burjin wind farm

Date:2017-05-05  Views:901
 Project  The first phase 49.5 MW engineering fire equipment of the xinjiang burjin wind farm
 Project Address  Altay, xinjiang
 Company  China water conservancy and hydropower engineering bureau co. LTD.
 Major Products  Fire pump, stabilizer pump, control cabinet